Development

Ready To Build
Commercial Operation Date

Arlumi Renovables, is perfectly structured to carry out the development of renewable projects, according to the script:

PHASE 1. COUNSELLING. Evacuation point. Optimal terrain.

In this type of work, initially, an exhaustive technical study is carried out of the substations with sufficient capacity for evacuation depending on the client’s requirements and, together, the possible effects are studied from a technical, economic and environmental point of view of the plots selected for the implementation of the installation and its evacuation infrastructures.

For the implementation, Arlumi Renovables has a technical team, made up of a salesperson, an engineer specialised in renewable energies and an environmental engineer, travelling around Spain in search of suitable areas for each of the renewable proyects.

STAGE 1

Search and location.

STAGE 2

Feasibility studies Environmental compliance Public administrations

STAGE 3

Closures and agreements. Standard contracts

PHASE 2. APPLICATION POINT OF CONNECTION.

Preparation of the necessary documentation for the request for the access and connection point, both for the distribution company and for REE.

aval proyectos energía renovalbe
STAGE 1

Presentation of the guarantee in the Deposit Box and confirmation is requested from Industry.

Informa Medioambiental
STAGE 2

Application for the environmental scope.

Punto Conexión Energía Renovable
STAGE 3

Application for the access and connection point.

PHASE 3. ADMINISTRATIVE PROCESSING.

In this phase it is necessary to fight with the administration to obtain, as quickly as possible, the administrative authorisations and thus the “Ready to Build” so precious to start building.

For the RTB, the technical team is divided into two departments, one for the technical, environmental and archaeological documentation and the other for the exhaustive monitoring of the administrative procedures in order to meet deadlines.

STAGE 1

Applications:
– Prior Administrative Authorization and Construction (PAA and CAA)
– Declaration of Public Utility (DPU)
– Environmental Impact Statement (EIS)

STAGE 2

Obtaining:
– Acceptance of the Execution Project.
– Environmental Impact Statement. (EIS)

STAGE 3

READY TO BUILD

PHASE 4. BUILDING

Phase where the renewable project is a reality and sustainability begins.

Licencia Obra Energía Renovable
STAGE 1

Work license.

Construcción Central Energía Limpia
STAGE 2

Building

Puesta en Marcha Energía
STAGE 3

Start-up. Admission as productor

STAGE 4

Commercial Operation Day